MAQcenter
TPM-Trak
TPM-Trak

TPM-Trak
TPM-Trak

The world-class manufacturers have an OEE, Overall Equipment Effectiveness, over 85%. Most manufacturers have a nearly 60% OEE. What is your OEE level?

MAQcenter offers TPM-Trak system that tracks the work being done by each machine, in real time, providing easy visual reports in any web browser, using data from the machine, job status and performance of manufacture. These reports are available on the intranet or Internet. It is a must for any business that needs to understand the performance of their machines.

TPM-Trak installation comprises:

  • A communication hardware module installed on each machine, a line or module in your workshop. This is the HMI touch screen with programmable logic controller (PLC module) or Industrial device (TID module) or the control system (TCS module).
  • A LAN Ethernet connection (wired or wireless) connecting the modules to the central server PC.
  • The TPM-Trak server PC running the software TPM-Trak.
  • Various display devices located in his office and in his workshop, networked TPM-Trak, which allow team members to see the real-time status of each machine and make decisions to improve their performance.

TPM-Trak can have an impact on the profitability of your workshop. In fact, investment in OEE monitoring technology is ten times more profitable to increase manufacturing capacity with another machine. It is not necessary to increase overtime, adding shifts, or invest in new equipment. You can choose to use the extra capacity is being lost in your company today.

TPM-Trak will help reduce inefficiencies, improve quality, and achieve maximum benefits with a simple configuration and easy installation, putting into production quickly and without requiring much ongoing support.

You need to do more than track OEETPM-Trak can also monitor the energy consumption of the machine and provide safe DNC program transfers to its machines. There are two ways to reduce inefficiency and improve your profits!

Contact us to find out how TPM-Trak can help improve production efficiency and reduce costs.

http://tpm-trak.com/

 

Para obter mais informação

 

MAQCENTER | Delegações
Barcelona
Polígono Industrial Rubí Sur
Avda. Antoni Gaudí, 142
08191 Rubí
Google Maps

Tel. +34 93 697 27 26
Fax +34 93 697 29 30
Barcelona
Valencia
Polígono Industrial L'Andana
Edificio ABM II, Planta 1ª Puerta 3
46980 Paterna
Google Maps

Tel. +34 93 697 27 26
Fax +34 93 697 29 30
Valencia
Madrid
Polígono Industrial "La Estación"
C/ Milanos, 10-Nave 54
28320 Madrid
Google Maps

Tel. +34 91 692 26 08
Fax +34 91 692 70 74
Madrid
Vitoria
Parque Empresarial INBISA
Av. de los Olmos, 1, Ed. C - Pab. 9
01013 Gasteiz, Álava
Google Maps

Tel. +34 945 12 33 60
Fax +34 945 28 47 56
Vitoria
Porto
Rua do Grés, 118
4445-266 Alfena, Valongo
Google Maps

Tel. +351 229 690 681
Fax +351 229 680 281
Porto
Usamos e cookies de terceiros para analisar seus hábitos de navegação. Se você continuar a navegar considerar a aceitar o uso de cookies. OK Mais info